The challenge
What needed to change.
Fourteen pumps remove millions of gallons of spring water from the Severn Tunnel site. PLC hardware was obsolete and support risk was increasing.

Control systems · Utilities & infrastructure
A supportable control platform for a historic pumping system that protects critical rail infrastructure around the clock.
The challenge
Fourteen pumps remove millions of gallons of spring water from the Severn Tunnel site. PLC hardware was obsolete and support risk was increasing.
Adbro’s approach
Adbro surveyed the live system and introduced modern, accessible controls while protecting the continuity of the pumping process.
The outcome
The station now benefits from improved reliability, easier support and a more responsive control system for this critical infrastructure asset.
Technical delivery
The detail below shows how the main equipment, software and interfaces were brought together—not just what the project achieved.
System scope
Six controller pairs use a master/standby arrangement so a PLC failure does not remove control from the associated pumping duty. A further controller completes the site-wide architecture.
Managed Westermo switches form four RSTP rings, providing alternate network paths if a cable or switch connection is lost.
Seven Wonderware InTouch stations give operators access to plant status, controls and alarms from the locations where the pumping system is managed.
Temporary control panels kept pumps available while legacy panels were replaced in stages, avoiding a full pumping outage during the control-system changeover.
Verification & handover
Each staged cutover included I/O checks, pump-control tests, master/standby changeover, network-ring fault testing, SCADA communications and alarm proving before the associated legacy equipment was removed from service.
Project highlights